How long does it take to demolish a house?
The physical teardown of a typical single-family home is often a matter of days. The paperwork before it usually takes longer: the asbestos survey, utility disconnects and the demolition permit have to be done first. Approval times vary by city, so plan for that part, not just the demolition day.
Larger homes, block construction, slab removal and pools add days of equipment work and hauling.
Utility companies set their own schedules for disconnects.
Weather and inspections can move the schedule.
All Out Rubbish gives a schedule once the permit and scope are confirmed, not before.