All cost guides

How Much Does Land Development & Site Work Cost?

Land development and site work in Palm Beach and Broward County costs $1,800–$8,000 for clearing and grubbing, $3,000–$15,000 for cut, fill and site balancing, $2,500–$9,000 for building pad prep and $1,500–$6,000 for drainage work with All Out Rubbish — licensed, insured and bonded, with a licensed contractor on every job site. Site evaluations are free.

All Out Rubbish
$1,800–$8,000 clearing · $3,000–$15,000 cut & fill
Typical market price
Typically $5,000–$50,000+ per lot depending on scope

What changes the price

  • •Lot size and how much dirt has to move or be imported.
  • •Existing structures or slabs that need demolition first.
  • •Drainage requirements — swales and retention are the big South Florida variable.
  • •Access for equipment and distance to disposal or fill sources.
Money-saving tip

Get the drainage designed before the pad is built. Fixing water after the slab is poured costs several times what it costs to grade correctly the first time.

Site work cost — common questions

How much does site work cost cost in Palm Beach and Broward County?

$1,800–$8,000 clearing · $3,000–$15,000 cut & fill in Palm Beach and Broward County with All Out Rubbish. Land development and site work in Palm Beach and Broward County costs $1,800–$8,000 for clearing and grubbing, $3,000–$15,000 for cut, fill and site balancing, $2,500–$9,000 for building pad prep and $1,500–$6,000 for drainage work with All Out Rubbish — licensed, insured and bonded, with a licensed contractor on every job site. Site evaluations are free.

What is the average cost of site work cost in Palm Beach and Broward County?

Most companies in Palm Beach and Broward County charge Typically $5,000–$50,000+ per lot depending on scope. Our flat rate is $1,800–$8,000 clearing · $3,000–$15,000 cut & fill, quoted before we start so the number never moves on job day.

Where can I find cheap or affordable site work cost near you?

Text a photo to (561) 345-9808 and we price it on the spot. Get the drainage designed before the pad is built. Fixing water after the slab is poured costs several times what it costs to grade correctly the first time.

Can I get a site work cost price without an on-site estimate?

Yes. Send a photo by text or describe the load on the phone and you get a firm flat price in minutes — no appointment, no walkthrough, no obligation.

Do you offer same-day site work cost in Palm Beach and Broward County?

Usually yes. We keep trucks and dump trailers moving across Palm Beach and Broward County every day, so same-day and next-day windows in Palm Beach and Broward County are normal, weekends included.

Is there any free site work cost near you?

Some items pay for themselves — appliances, metal, and scrap can offset or cover the haul. Anything a charity can still use we'll drop off for free. Everything else is a flat rate with no hidden dump or fuel fees.

Site work cost prices by city

Related cost guides

Want the whole flat price list? See flat-rate pricing.

Flat all-in price up front · Licensed & insured · Same-day service