All answers

Pricing

How much does it cost to haul away concrete?

Concrete removal and haul-away in Palm Beach and Broward runs about $4–$8 per square foot for breaking and removing a slab, or $150–$400 per load for haul-away of already-broken concrete. Concrete is priced by weight because the transfer station bills by the ton. Text photos to (561) 345-9808 for a firm number.

Concrete, tile, dirt, and roofing shingles are the heavy-debris categories — they're never priced by trailer volume like household junk.

Already-broken concrete in a pile is the cheapest version: we load and haul by the load.

Breaking a slab adds labor and equipment — thickness and rebar change the price.

Clean concrete can often go to a recycling facility, which is cheaper than the transfer station — we factor that in.

Last updated 2026-10-04.

Flat all-in price up front · Licensed & insured · Same-day service