Demolition comparison

Full Demolition vs Deconstruction

Should the house come down with machines, or be taken apart piece by piece to salvage materials?

Deconstruction means dismantling a building by hand to save reusable materials. Full mechanical demolition is faster and is what most South Florida teardowns use.

Full mechanical demolition

Best for:

  • You want the lot cleared quickly
  • The house has little salvage value
  • Storm, fire or flood damage

Deconstruction

Best for:

  • Historic or high-value materials
  • You want to donate materials
  • You have time and budget for slower work
Full mechanical demolitionDeconstruction
SpeedFasterMuch slower, mostly hand labor
SalvageSelected items can be pulled firstMost reusable material is saved
LaborEquipment does most of the workLarge crew, more hours
Permits and asbestos reviewRequiredStill required

Our take

Most owners choose full demolition and pull a few items first, such as doors, fixtures or cabinets. If you want something saved, tell us before demolition day.

Questions

Can I keep things before the house comes down?

Yes. Remove what you want first, or list items to set aside before demolition day.

Does deconstruction skip the asbestos survey?

No. Asbestos rules apply to demolition and renovation either way.

See the service page, what we demolish or all comparisons. We handle the permit and are licensed, insured and bonded.