Broward County demolition permits

Demolition permits in Pompano Beach, FL

What it takes to legally tear down a house, mobile home, pool or commercial building in Pompano Beach. We handle the permit as part of the job, and we are licensed, insured and bonded.

Step by step

  1. 1. Confirm who reviews the permit

    A Pompano Beach mailing address does not always mean the property is inside Pompano Beach city limits. Check the parcel's jurisdiction first. Properties inside the city use the city building department; unincorporated parcels use Broward County.

  2. 2. Asbestos survey and notice

    Broward County requires its asbestos Statement of Responsibilities process at least 10 working days before demolition or renovation begins, and a Certificate of Submittal for the building application.

  3. 3. Utility disconnects

    Electric, gas, water and sewer or septic usually need to be disconnected or capped before the permit is issued or before work starts. Each utility handles its own disconnect.

  4. 4. Other reviews that can apply

    Tree protection, historic designation, HOA rules, lender approval and landscape review can all affect a teardown. Check them before scheduling equipment.

  5. 5. Permit issued, then demolition

    Once the permit is already pulled, we can offer same-day demolition service. We handle the permit as part of the job, and we are licensed, insured and bonded.

  6. 6. Final inspection and the lot

    After demolition, the building department may require a final inspection. We take the property back to a cleared, flat lot for whatever comes next.

Official sources

Rules change. Confirm current requirements with the reviewing office; we do this as part of every job.

Pompano Beach demolition permit questions

Do I need a permit to demolish a house in Pompano Beach?

Yes, whole-house demolition needs a permit from the office that reviews the parcel, either Pompano Beach or Broward County. We handle the demolition permit as part of the job.

Who pulls the demolition permit in Pompano Beach?

We do. Pulling the permit is part of our demolition service.

Can demolition start the same day?

Once the permit is already pulled, we can offer same-day demolition service. Before that, the permit stage sets the timeline.

Do I need an asbestos survey for a house?

In Broward, the county asbestos process must be done at least 10 working days before demolition starts, including for houses. The fee exemption for small residential buildings is not an exemption from the process.

Do I need a permit to remove a pool or shed?

Often yes. Pool removal and many accessory structures need a permit. Check with the reviewing office, or send us photos and we'll tell you what's involved.

Ready to start? See house demolition in Pompano Beach, what we demolish or the full demolition guide.